Start free
REAL COMPLETED JOB · CUSTOMER DETAILS WITHHELD

Four doors. Four drawers.
One clear cabinet estimate.

Yerg Remodeling completed this bathroom cabinet repaint for $2,200. The estimate below was recreated from the owner’s confirmed scope and job figures. It is an editable demonstration, not the original bid or an AI-generated historical price.

Customer total$2,200
Combined labor & materials$880
Gross profit$1,320
Gross margin60%

Before overhead and taxes. Costs entered by the owner; this job’s result is not a guaranteed margin. The customer’s address, phone and surname are omitted.

  1. Review the scope in Projects.
  2. Open Quotes and edit the package, quantities or price.
  3. Download the branded PDF. Explore Job margins for the entered cost comparison.

Demo edits stay in this visit. One saved project is free in your private workspace. See the painting scope checklist.

Interactive demo
YERG REMODELING • REAL-JOB EXAMPLE

Estimates

Add work items, check your prices, then download or send.

Real completed cabinet job · Owner-confirmed figures, recreated estimate. Customer contact details withheld. Edits stay in this visit. Create your first estimate free

Estimate builder

Bathroom cabinet repaint — Cynthia. · Cynthia.

Draft
Yerg Remodeling

Arlington, TX bryan@yergservices.com 469-354-9722 https://yergremodeling.com

Add your work items below, check the prices, then download or send the estimate.

Optional: help me build the estimate

Use job notes, photos or a walkthrough to prepare an AI draft. Review the suggested scope and prices before applying it.

Follow-ups, selections, purchasing & job records
Quote follow-up reminders

Quote: Draft. Review a reminder here, then authorize a customer email. Reminders do not send automatically.

Follow-up sending is paused because this quote is not awaiting a response, has no active customer link, or follow-ups are stopped.

Customer selections & allowances

Track finish choices against their budget. Approval here records your confirmation with the customer; it does not change an accepted quote. Use a change request for a price adjustment.

Material shopping list & purchase order draft

Only included Material rows appear. Pack counts round up using your entered coverage. Unit costs are per estimate unit, not per package. This creates a document; it does not order or pay a supplier.

Supplier & subcontractor bid comparison

Recording or choosing a quote does not award work or contact the vendor.

Daily logs & expense records

Recorded expenses: materials $0.00, labor $0.00, other $0.00.

Applying replaces totals rather than adding them twice. Receipts and costs require your review; no bank or accounting sync is running.

Milestone payment schedule

Each invoice counts against the remaining approved total. No automatic charging or collection occurs.

Warranty & service reminders

These record your own follow-up dates; they do not create or extend a warranty.

Reusable job packages

Save this estimate’s work items as a package. Next time, change the job quantity; labor and materials scale together.

Example: 300 sq ft of flooring. Existing row quantities—including any waste already entered—are saved exactly. Customer details and terms are excluded.


Measure a drawing

Open a PDF, JPG or PNG; set a known dimension, then measure areas, lengths or counts. Files are processed on this device. Only reviewed measurement records are saved with the project; the drawing must be reopened after leaving.

Saved plans & revision history

Save drawings privately in your workspace, then reopen them for measurement. Comparing versions is side by side; it does not automatically detect differences.

Plan storage is available in your signed-in workspace.

Bathroom cabinet refinishing

Section total$2,200.00

Labor $0.00 · Materials $0.00 · Other $2,200.00

Units, grouping & optional upgrade
1 × $2,200.00 = $2,200.00
Pricing adjustments & customer terms

Hidden by default. Customer unit prices include markup; internal costs remain private.

Subtotal$2,200.00
Discount$0.00
Markup$0.00
Tax$0.00
Quote total$2,200.00
Requested deposit$0.00
Spreadsheet export

Applying a quote sets the project’s base revenue before tax. It does not change entered actual costs or record a customer acceptance. Tax is calculated from your entered rate; confirm applicability with your accountant.